By Admin | Construction & Tips
18 April 2016

In this article we consider the sequence of repair of apartments and will provide some guidance to the action with which the work will be much easier.If you decide to venture into the apartment repairs, the number of questions will arise even before it began.Everyone knows that in any case better define a clear sequence of actions, than to rush from one thing to another, trying to do everything, to waste time and nerves to correct their own mistakes.

The sequence of repair apartments

Contents:

  1. Planning for repairs and preparations
  2. Removing unnecessary items
  3. Repair and installation of communication
  4. sequence finishes of different parts of the room
  5. sequence repair individual room apartment
  6. Video: The order of works in the repair

Planning for repairs and preparations

Before you start preparing for repairs need to clearly decide what exactly you want to change.This can be redecorated - Wallpaper replacement linoleum, update the ceiling.Or do you need a

major overhaul with the alignment of walls, replacement of doors and windows, remodeling or repair the floor.This will determine the sequence of work in the repair of apartments, as well as the need to attract some professionals and related financial costs

necessary to detail reflect the layout and design of the room.You have to decide what will be the form of the ceiling, its material and design, whether you hang wallpaper or leave painted walls, where to position switches and sockets, which set the lights, and in what quantity, what would cover the floor.Take a sheet of paper and shall describe in detail each item.This will be an indicative plan of action during the repair.Think about how you arrange the furniture after use.After all, it too can play a role in the design nuances of painting and decorating.

worth to think in advance where you will be able to move during the repairs and where they can carry large pieces of furniture and interior elements, which would interfere during operation.If you have no place to store the furniture, you should move it into one of the rooms, put the most compact and carefully pack the stretch film.This repair work begin in the other rooms.Then the furniture is transported to one of the finished rooms, and freed to conduct the necessary work.

Planning for repairs and preparations
Photo - brooklynhomeexperts.com

Removing unnecessary items

next step in the order of repair of an apartment is the dismantling of old elements.At cosmetic repair this may just be the removal of old wallpaper, removing the layer of linoleum.In more complex cases at the stage of dismantling the walls are cleaned, change the place of door frames, walls are in special niches, etc.It is important not to throw away all the old materials immediately.Many of them still will be useful.You always have time to do it after the repair.

In older homes may need to remove unnecessary barriers and old coatings.If you do not plan to change the entire floor, then you need to update it as follows.First you need to assess whether it is in need of renovation and insulation.Then spend the processing of modern materials can have spoiled even replace some items.Before the end of the repair should be about making the floor with cardboard or construction foil to avoid damage.

Repair and installation of communication

After dismantling suitable place next stage - repair of communications systems.This is a good time to replace the radiator, exhaust and air conditioning installation, upgrade electrical wiring.Communication Plan must be carefully prepared even during the planning.

Note!If you plan to build new walls, it must be done before the construction of communications, so you do not have anything to break and remake again.

If the walls are hollow, the electrical wiring is usually conveyed in the frame.For solid wall construction, make Grooves in that hide the wires.The same applies to pipes.If you can get them into the wall, it is best to do so.Installation of switches and sockets can be made after all the decorating.So they will be able to maintain a neat and clean appearance.

Notice.The toilet and the bathroom first line the walls, and laid tile and only after that is installed plumbing.

sequence finishes of different parts of the room

1. All trim made from the top down: ceiling - wall - floor.It is a sequence of works ensures that the already renovated parts of the room will not be affected when installing the rest.

2. However, if there is a need for leveling floor screed, start to repair it from this stage.You can use ordinary cement-sand mixture for masonry.This method is quite economical.But if you can, it is better installation with self-leveling self-leveling floors.They are certainly more expensive, but the result will justify the money spent.Dry they were on day 15 after casting.If you decide to install the system "warm floor", it should be done at a stage ties.

3. To align the walls used stucco.Depending on their condition may require one or more layers.This will determine the duration of this stage and, respectively, the total duration of the repair.

4. After plastering you can proceed to the final part - plastered surfaces.Very gently and carefully shpaklyuyut all irregularities, traces in the ground installation of communications.Produced final preparation for final finishing.It is important to choose a good primer.This will help avoid problems when puttying and painting.It depends on the quality of the degree of adhesion primer paint or filler to the prepared base.

5. In the next step you can make flooring finish flooring laminate flooring or linoleum.

6. Next install doors and door frames.To the door in the next stages are not corrupted, you can remove or cover film.At the same time strengthen the trim on the door at this stage is not necessary.

7. Then you can move on to the walls of wallpaper pasting.

8. After all this, install baseboards, decorative items and accessories, switches and sockets, trim, door hung and fixed frames.

Posledovatelnost repair facilities
procedure for repairing parts of the room.

repair sequence of separate rooms apartment

recommended to begin repairs to the most remote from the entrance door of the room.This will prevent dirt and debris in an already renovated room.This is especially important if the room is communicating, for example, living room.At the very least a renovation of the corridor, as through most are construction materials, trash and other items that can damage the newly renovated walls, floor or ceiling.

When the repair finishes next room, the door to this room should be tightly closed and the construction hang cellophane.This will avoid getting paint, plaster, dust and dirt on the newly mounted friendly finishing materials.

Video: The order of works in the repair


Add a question not received an answer to your question?It was not clear moments?
Ask our experts and visitors:

+ Add new question


Case material:
Is it better to build a private house or flat
What is better for a private house or flat depending on the needs, preferences and capabilities
How to calculate the area of ​​a room
How to calculate the area of ​​a room - formulas and calculation methods
How to start a kitchen renovation
Where to begin renovation of the kitchen with his hands and make it as soon as possible
Repair of bathroom
Where to begin repairs in the bathroom - competentorganization of repair works
Where to start repair of apartments
Where to start repair apartments and finish it as soon as possible