Fill reinforcing belt

By Admin | Building
26 May 2016

Laying nets - one of the important stages of construction home.Tape made of reinforced concrete on top of the walls to strengthen the clutch piece of material, such as blocks or bricks, and to stiffen the entire surface of the house.

Construction companies produce finished blocks Laying nets.Dmitry Kuzmin considers it inappropriate to pay for finished products.

Production box

Dachnik decided to make a U-shaped blocks independently of dobornyh blocks.Material thickness of 10 cm is placed on the adhesive to the outer sides of the building.Then of 5 centimeter sheets of extruded polystyrene foam (or mineral wool) is performed thermal circuit.Finally, put five inside.Depending on the design of the wall can be used in lieu of plywood formwork.

inside a rectangle placed rebar diameter of 8-12 mm, knit frame - two at the top and bottom of the rod.To create a protective layer of concrete reinforcement are not placed on the blocks, and a special mounting sprocket.Thus the top and bottom of a gap of

about 3 cm. Then poured, the concrete is compacted and leveled.So get ready to reinforcing belt.

When the device wooden ceiling of the second floor studs Laying nets also attach the ceiling to the roof is not pulled away from the house.In this case, the studs are installed around the perimeter of the walls every 60 cm. The meter products sawn in half, one part is inserted into the other sticking out.Dmitry Kuzmin left 20 mm above the studs Laying nets.This will then allow the length of the overlap of the nut draw.

Helpful Hint

Usually concrete is poured from the sleeve using a concrete pump.This greatly simplifies the like operation.However, when casting Laying nets on the second floor to take advantage of this method will not work: falling from a height, the concrete can destroy the formwork.Therefore, the fill had to be done manually.To facilitate this a physically challenging job, Dmitry advises to resort to some tricks.

Calculate the subsequent burden on the walls by pouring Laying nets.At light loads you can save.

If on the first floor Laying nets made of 225 mm wide - the entire height of the block, on the second floor to raise such amounts of concrete cottager considered redundant.Here, the walls will draw only the roof, which weighs less than the second floor.

Therefore, the organization of boxes to fill Laying nets builders laid down the 10-inch finishing accessories unit.Thus they seem lifted Laying nets and halved its volume, not by narrowing (to save the bearing area) and by the thickness.As a result, instead of six cubic meters of concrete was covered with only three.