The device is a simple plank floor

By Admin | Recommendations
06 May 2016

plank floors suit from the dry boards planed mainly conifers.Before you start, the board should be sorted and cut to length.Flooring boards can be connected in different ways: in prifugovku by thorns of a quarter or tongue.The thickness of the boards is selected depending on the type of room and the distance between the joists and beams.

So if the distance between the beams is equal to 80 cm., The thickness of the boards must be 37 mm and at a distance of more than 50 cm can be used 25 mm thick board.Where used for floors grooved boards, their thickness can be reduced by 5 mm.

joists made of dry wood of coniferous and deciduous trees.Not recommended for this purpose linden and poplar.Logs can be in the form of plates or bars.You can use logs, pre-peeled and bast.The upper part of the round lag otёsyvayut and ostrugivayut plane.Logs should be based on brick pillars, which are stacked two layers of roofing felt or roofing material, through the wooden lining.The thickness of the lag must be at least 4

0 mm, width of not less than 100mm.The bars are made of good solid brick fired in cement mortar.The distance between the axes of the columns are generally selected is the same as between axes lag.

should be borne in mind that the logs and wooden lining on all sides and on the bottom side of the board before the work should be thoroughly soaked with antiseptic.Also, before nastilkoj Flooring is desirable to cover the bottom with a thin layer of wood tar.Adjustment and splachivanie flooring boards must be performed as carefully as possible.

in a residential area of ​​the floor is better to arrange a grooved boards.They should be laid in the direction of wall with windows, as well as the path of greatest circulation.
During Flooring of grooved planks laid one board first with a groove, align it on a level, compared with a pre-plotted marks.Then nail it to lag with nails length exceeding the board thickness 2.5.Nails need to score in the lower cheek of the groove at a slight angle.Then the groove board is got laid next ridge board.Further, using special clamps or wedges boards are pressed towards each other so that the comb is fully seated in the groove.Hammered nails should be drowned in such a way that the finished flooring can be freely ostrogannoj.In order to more accurately dock ends, we can recommend both saw off the two abutting boards.

in a residential area of ​​the floor is better to arrange a grooved boards.They should be laid in the direction of wall with windows, as well as the path of greatest circulation.In the process of grooved flooring boards initially laid one board with a groove, align it on a level, compared with a pre-plotted marks.Then nail it to lag with nails length exceeding the board thickness 2.5.Nails need to score in the lower cheek of the groove at a slight angle.Then the groove board is got laid next ridge board.Further, using special clamps or wedges boards are pressed towards each other so that the comb is fully seated in the groove.Hammered nails should be drowned in such a way that the finished flooring can be freely ostrogannoj.In order to more accurately dock ends, we can recommend both saw off the two abutting boards.

boards are not adjusted to the wall 20 mm.The remaining slots are closed plinth.
in the corridors, and various auxiliary rooms you can arrange the floors of the usual neshpuntovannyh boards.In this case, the nails are hammered vertically.Boards that have a large number of branches is better to lay near the walls, and in the middle of the room should be laid hardest boards.
evenness laying the floor is necessary to check the two-meter rack.This gap between the floor and the rail shall not exceed 2 mm.Particular attention should be paid to care compound boards.

The underground is necessary to provide sufficient air.This will contribute to better preservation of wood flooring and lag.For this purpose, in opposite corners of each room, as well as near the heaters in the floor mounted air vents.For they did not get water when washing floors, railings should be set slightly above the floor level.

after laying floors need to ostrogannoj, proshpaklevat, proolifit and sexual enamel paint twice.The second layer should be applied after the first is completely dry.Paint must be shade along the boards, leaving a very thin layer.The second layer was dried for several days.Then wash the floor with warm water.It is recommended that the first week from time to time to wipe the floor with a cloth soaked in warm water.The floors, painted enamel gender, should be washed with warm water without the addition of detergents.